Mining
- Manufacturing and Erection of 3 units of 53-meter Stacks for Tabas Coal Washery Plant (560 Tons, 2011-2012)
- Manufacturing and Erection of Piping-ducting systems and other equipment for tabas coal washery Plant. (4600 Tons, 2001)
- Manufacturing of chute, hopper, conveyors and all other mechanical equipment for Sangan Resources (1200 Tons)
- Installation and commissioning of filtration mechanical equipment, crusher, belt conveyor and ducting for tabas coal washery Plant. (6000Tons, 2012)
- Installation and commissioning of hot and cold production lines, furnace and diesel generator for Tabas Coal Washery Plant. (6000 MT, 2012)
- Manufacturing and Erection of coke trestle system of material transmission for Tabas Coal Washery Plant. (700 Tons, 2012)
- Installation of all covering for trestle system of material transmission for Tabas Coal Washery Plant. (6000 Sqm)
- Manufacturing of Coal Washery equipment for Tabas Coal Washery Plant. (170 Tons, 2012).
- Manufacturing of the equipment for the Mehrgodaz Refractory Co. (250 MT, 2003)
- Manufacturing of the equipment of the raw material preparation for Refractory Products Co. (80 MT, 2001)
- Manufacturing of the equipment of the raw material preparation for Mehr Godaz Co. (80 MT)
- Manufacturing and Erection of equipment of molybdenum production development plan for Sarcheshmeh copper Co. (160 MT, 2001-2002)
- Manufacturing of Shuttle Kiln (1800 °C) for NasoozAzar Refractory Co. (150 MT, 2000)
- Manufacturing of handrail, ladder, platform and grating for mills of Sarcheshme Copper Co. (500 Ton, 2011-2012)